What we do

Project Support

From Spec to Sign-Off

We don't just sell coatings — we work alongside contractors and specifiers at every stage of the project to make sure the right system gets installed correctly the first time.

A Technical Partner, Not Just a Supplier

Most coating suppliers hand you a product data sheet and walk away. Ram Urethanes stays involved. Whether you're bidding a job, training a crew, or troubleshooting a substrate issue on site, we're available to support the work — because we've done it ourselves.

On-Site Visits

Eyes on the job when it matters most

Our team visits job sites to assess substrate conditions, review application setups, and verify that environmental conditions are within spec before coating begins. We identify potential failure points before they become callbacks.

  • Pre-application substrate assessment
  • Environmental condition verification (temperature, humidity, dew point)
  • Application equipment inspection and setup review
  • Mid-project quality checks and milestone inspections
  • Post-application review and documentation

Crew Certification

Trained applicators. Warranted results.

We certify installation crews on Ram Urethanes product systems — on site, in real conditions. Certified crews understand mixing ratios, application techniques, film thickness requirements, and quality control checkpoints specific to our formulations.

  • Hands-on product application training
  • Mixing, ratio, and pot life instruction
  • Film thickness and quality control procedures
  • Safety and handling requirements
  • Certification documentation upon completion

Material Takeoffs

Accurate quantities before you bid

We review project drawings and specifications to calculate accurate material quantities for your bid. No guessing, no over-ordering, no mid-job shortfalls. Our takeoffs account for substrate conditions, coverage rates, and system build requirements.

  • Drawing and specification review
  • Coverage rate calculations by system and substrate
  • Multi-coat system quantity breakdowns
  • Waste factor and contingency recommendations
  • Itemized material list for procurement

Overall Project Guidance

Technical support from start to finish

From initial specification through final inspection, we provide ongoing technical guidance for each project. We help contractors navigate substrate challenges, system selection decisions, and specification compliance — so the project closes without issues.

  • System selection and specification writing support
  • Submittal and product data sheet preparation
  • Substrate compatibility and surface prep guidance
  • Troubleshooting and field problem resolution
  • Project close-out documentation support

Our process

How We Work With You

01

Project Review

Share your drawings, specs, or project scope. We review the system requirements and identify the right Ram Urethanes products for the application.

02

Takeoff & Proposal

We calculate material quantities and provide a detailed breakdown so you can bid with confidence and order accurately.

03

Crew Certification

Before application begins, we certify your installation crew on the specific system being applied — on site or at a scheduled training.

04

Site Support

We visit the job site at key milestones to verify conditions, inspect application quality, and resolve any field issues before they escalate.

05

Project Close-Out

We support final documentation, inspection sign-off, and any warranty requirements so the project closes cleanly.

Have a Project Coming Up?

Reach out early — the best time to get us involved is before the bid goes out.

Start the Conversation
Ram UrethanesUltimate Protection Unleashed

Copyright © 2026 Ram Urethanes — All Rights Reserved.